Skip to main content

Five other ways to get this built, and how I compare

I am Ahsan Mahmood, an AI-native full-stack developer in Lahore with 8+ years of hands-on experience. AI agents write most of my code now; I decide what they build, review it and confirm it works. That is one way to get software made. These are the other five, including the jobs where I would send you to them.

The five routes​

None of these is the wrong answer. Each one fits some jobs better than I do, and its page says which.

How I work now​

I can write all of this by hand, and for most of my career I did. I work through AI agents now because they produce code far faster than I can. I decide what gets built and how, I tell them, and I review what comes back. Nothing is finished until I have confirmed it is correct.

What took me a month now takes a day or a week, and I would put the change at 10 to 100 times. That is my own statement from doing the work rather than a measurement, so read it beside the dates here.

What you can check​

My side of this rests on the products below. Each one opens, and each date comes from its commit history or my own project records.

Rent Party​

A property-trading party game you can play online or around one phone.

  • 5 October 2026: First commit.
  • 6 October 2026: A live site with the design system and the shell, and no game in it yet.
  • 7 October 2026: The rules engine and the computer players.
  • 8 October 2026: Online rooms, the lobby and invites committed.
  • 7 November 2026: Still being fixed and finished, a month on.

Ahsan Mahmood Portfolio​

This site, rebuilt from nothing.

  • 31 July 2026: Planning and the first design pages.
  • 16 August 2026: First commit of the new app. Its message records five defects the automated checks had passed.
  • 17 August 2026: The data platform, 38 tables, and three more defects no automated check had seen.
  • 21 August 2026: The rebuild took over this address.
  • 5 November 2026: Moved to a new host.

CallVault​

An offline-first Android app that records your own calls, with a web dashboard. Deliberately not on Google Play.

  • 22 June 2026: First commit. Call capture, browsing and playback were committed the same day.
  • 24 June 2026: The web dashboard went up.
  • 17 September 2026: The backend went live with its plans and release engineering, nearly three months later. The fast part was the first two days.

Those dates come from each product's commit history and my own project records, and they say nothing about how long your project will take. A date for that comes after a scoping call.

Not sure which route fits?​

Tell me what you are building. The first call is free and lasts thirty minutes, and if one of the other routes suits the job better, I will say so on that call.

Contact

Last checked 7 November 2026